AS9120B, ISO 9001:2015, and FAA AC 0056B Accredited

Part DD101 LONG LEAD of Crl Components Inc with NSN 5910-00-678-8157 - Get a Quote

MPN: DD101 LONG LEAD

Alternate P/N: DD101LONGLEAD

CAGE Code : 71590

Manufacturer: Crl Components Inc

Item Name : Capacitor Fixed Cer

Limitless Purchasing is your sourcing solution for all of your NSN part needs like DD101 LONG LEAD, offering rapid lead-times and competitive pricing on everything that we carry. Manufactured by Crl Components Inc, this Capacitor Fixed Cer component is listed alongside the NSN part number DD101 LONG LEAD for your ease of procurement. With current availability for this NSN part on our website, we invite you to begin the purchasing process by filling out the RFQ form as provided below. Once received by our team members, a dedicated account manager will review and respond in 15 minutes or less with a personalized quote that accommodates your individual needs and requirements.

PRODUCT DETAILS “*” Required Fields Are Compulsory

CONTACT INFORMATION

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Note : We Will Not Share Your Information To Any Third Parties.

  • Upload RFQ SHEET
  • If you have more than one item, upload your spreadsheet here

NSN parts are those that follow the National Stock Number system as dictated by the United Nations, allowing for easier identification, supply, and procurement of standardized materials. As a leading distributor of NSN parts, we can help customers source the new, used, and obsolete components that they need from top global NSN parts manufacturers such as Crl Components Inc. If you are facing an Aircraft on Ground (AOG) situation, we also offer same-day and expedited shipping for a number of items that we carry. With over 2 billion items at your disposal, Limitless Purchasing can serve as your strategic sourcing partner for all of your operational needs. Get started on the purchasing process for NSN 5910006788157 and other parts such as DD101 LONG LEAD that you have been searching for today and see what we can do for you!

NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item Description:

Capacitor Fixed Cer

59100067881570P
CIICHCCESDPMICCriticalityENAC
U A0
Part NumberISCRNVCRNCCHCCMSDSSADC
Dd101 Long Lead11CA

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES, RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B-
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10.00/+10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

  Corresponding National Stock Number to DD101 LONG LEAD

We are proud to supply every branch of the United States military


Why Choose Us?

Low Price Low Price Warrantied inventory at competitive prices
Find it fast Find it fast Search the world's largest inventory of electronic components by manufacturer, category or part number
Get it fast Get it fast All inventory ready to ship from our sellers
Quality guaranteed Quality guaranteed We sell only warrantied and traceable parts


Semiconductor's Certifications and Memberships
The only independent
distributor with a
NO CHINA SOURCING Pledge
  • All parts are stocked in the USA.
  • All parts are shipped from the USA.
  • All shipments must comply with U.S.A export laws.
  • No exceptions.

“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”.

Thank You for Visiting.

We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.